Beyond Topographic Land & Construction SurveyingDenver metro, Colorado

M-100 Colorado

Land & Construction Surveying

MEP Construction Layout

Accurate layout for the trades building Colorado.

MEP is mechanical, electrical and plumbing. We do construction layout for those trades on building projects, and electrical layout is our established work.

Trade layout has to be accurate and coordinated, and the crew installing the work has to be able to use it. Correct on a screen isn't enough.

Detail 1 / M-100Sleeves and embeds on the grid

Our established focus

Electrical layout

Scale: NTS

Since 2024 we have done the layout on project after project for Hi Power Electric: high-rise, multifamily and commercial buildings in Colorado.

Hi Power ElectricElectrical layout
since 2024

The model comes from the trade's VDC team. We clean it to the building grid, check it against the drawings and stake it where the crew needs it.

  1. Sleeves and embeds located on the deck before the pour
  2. Deck pour layout, floor by floor
  3. Site electrical
  4. Points from VDC model exports, on the building grid
  5. Re-checks when the model or the drawings change

Growing with the trades

Mechanical and plumbing layout

Mechanical and plumbing layout run on the same control and the same checks as our electrical work. We are taking on that work now.

Tell us your scope and we will tell you straight whether it fits.

Send us M-100

  1. Your trade and the scope
  2. The model export or CAD
  3. The building, the town and the floors
  4. When the first area has to be ready

Vertical construction

Every trade on the same grid

On a building with several trades, everyone needs the same grid and the same control. We work on the building grid the coordinated model uses. Each trade's layout comes off the same control, so the work lands where the model put it.

On a multistory job that control has to carry up the building, floor by floor, while the deck is busy. High-rise and vertical construction

Survey rod and data collector held on an elevated deck, a crew working on the forms behind
Rod and data collector on an elevated deck, crew on the forms behind.

Why a construction-focused surveyor

What the trades get from us

Keyed notes
MarkNoteWhat it means on the job
K1

Planned ahead

Control and points ready before the pour window, not during it.

K2

Readable layout

Marks the crew can read and build from, without a phone call to decode them.

K3

Checked first

Layout checked against the current model and drawings before it leaves our hands.

K4

Knows the sequence

We know the schedule moves. We plan the layout around the deck, the pour and the other trades.

K5

One call

The surveyor who set the control is the one you talk to.

K6

Licensed

Brandon Pulling, PLS, is accountable for the work.